1. For clear surfaces of contact of a case and the trundle bed. The flutes that are available in consolidations bearers will be pure. |
2. To establish consolidations of rubber in bearers' flutes. |
3. To apply a layer of the selante in flutes and to establish uvulae of placing in grooves of consolidations of rubber. |
4. Glance that the openings in the placing coincided with openings in a surface of contact of a case. Install at the place the trundle bed, glance that the placing did not move. |
5. To establish pins of fixation of the trundle bed and to hold tight them in two steps according to the moments of inhalation. |
6. To establish the new placing in a covering of the walk and to install the water bomb. To install the thermostat and the case of the thermostat. To join a tube of rear branch of the water road. |
7. To apply the selante in a lavador of pulley of axle of crank. Establish a pulley, a lavador and a pin of fixation. Hold tight a pin according to the moment of inhalation. |
8. To establish all the compounds and the sensors of the control of the pressure of oil. |
9. A hose puts the secondary passage a tube of rear branch of the bomb of cooling the liquid. |
10. If it is supplied by a drawing, to place in the cylinder block the conductor of heat of oil together with the new consolidation, then to insert the capture and to hold tight it so that the tubes of the conductor of heat were turned below the necessary corner. |