1. To check the inter-connected surfaces of the bomb of oil and a case, they will be pure. |
|
2. The pointed end inserts an end of power of six sides of the bomb in the direction of the distributor. The lock lavador has to settle down in the distance of 127,5 mm of the round one - of the end of the main end. |
3. To install the bomb of oil, having concentrated in a case for two pins, to hold tight pins according to the moment of inhalation. |
Prevention
During the installation of the bomb it has to be filled of the motor oil and to turn manually in a whole revolution.
|
|