FORD'S SCORPIO

1985-1994 of launch

Repair and operation of the car



Ford Skorpio
+1.1. Identification of the car
+ 2. Maintenance
- 3. Motors
   +3.1. Motor of OHC
   +3.2. Motor of DOHC
   +3.3. Motor of V6
   +3.4. Systems of ignition and management of motor
   -3.5. Diesel engines
      3.5.1. Technical characteristic
      3.5.2. The repair that does not demand the removal of the motor
      3.5.3. Check and adjust of valves slits
      -3.5.4. Fuel system
         3.5.4.1. Mouths
         3.5.4.2. Taken of incandescence
         3.5.4.3. Check of a compression
         3.5.4.4. Removal of air of system of fuel
         3.5.4.5. Removal and installation of the bomb of fuel
         3.5.4.6. Check and adjust of turns of wasting time
         3.5.4.7. Increase thread in turns of wasting time
      +3.5.5. Head of the cylinder block
      3.5.6. Removal and installation of the motor
      +3.5.7. Desmontagem, repair and meeting of the motor
      3.5.8. Turbocompressor
      +3.5.9. Lubrication system
      +3.5.10. System cooling
      3.5.11. Bad functioning standard of the motor
+4. System cooling
+5. Fuel system
+6. Union
+7. Transmissions
+8. Driving axle and rear bridge
+9. Direction
+10. Supports of the triangular form of interruption
+11. Brakes system
+12. Wheels and tires
+13. Body
+14. Electric equipment


bfe6b27a


3.5.4.7. Increase thread in turns of wasting time

GENERAL INFORMATION

To secure the constant operation of the motor in the launch of the cold motor and in the course of heating the special device of the increase in turns of wasting time that when the bomb of the high pressure working the sensor for a thread is in use.

The place of connection of a thread of increase in turns of wasting time to the lever, a nut of agreement and a countersow

1 - place of connection of a thread of increase in turns of wasting time,

2 - nut agreement,

3 - countersow

Removal

ORDER OF REALIZATION
1. To withdraw a clip in the end of a thread of the increase in turns of wasting time and withdrawing a thread of the lever.
2. To unscrew a covering does away with the bomb.
3. To unscrew of a head of the cylinder block the sensor of the management together with a thread.

Installation

ORDER OF REALIZATION
1. To twist in in a head of the cylinder block the sensor of the management together with a thread and a new ring of fighter of copper.
2. To heat the motor up to the work temperature.
3. To establish a covering does away in the bearer and to fix a thread in the lever through a clip.
4. To adjust the screw of agreement in a thread they cover a tension of end so that the thread had a side 2 mm play soon to hold tight a countersow of the fixation of a covering of a thread.