1. To install in an opening in a rear part of an end of inclination (adaptation 21.044) the load of end of union. |
2. To insert in nests in the cylinder block they dry semiinsertions of radical loads. |
3. To the oil the surfaces of work of the semiinsertions and to establish in them an end of inclination. |
4. To establish together with the oiled semiinsertions of a covering of radical loads (to see the rice. Identification of coverings of radical loads and conrod). The firearms in coverings of radical loads have to be sent towards a pulley in the doubled one to an end). |
5. To hold tight pins of coverings of radical loads the corresponding moment and to measure a play of axial side of an end of inclination. |
6. 21.011 establishes a new ring of rear fighter of an end of inclination through the adaptation. |
7. To cover a flute of a covering of a rear selante of an end of inclination with the briefcase what pressuriza (number approximately 70 SX-19554-BA) and to establish two halves of the placing through the screwdriver with the blunted edge; the red designation of the placing has to go to a load covering. |
8. To establish an advanced covering of the cylinder block together with the new placing. |
9. To establish a new ring of advanced fighter (adaptation 21,009 A). |
10. To annex an intermediary end and his persistent load to the cylinder block; to establish a covering with a new fighter ring. |
11. To establish a pendulum in an inclination end, when the fastenings of the pendulum are holding tight pins (to the oil a woodcarving) the corresponding moment. |
12. Through the adaptation 21.044 to center a plate of pressure in a pendulum and to establish the main part of the union. |
13. To cylinders of oil and pistons with the established one appropriately piston rings. |
|
14. To install ties the stick of piston with knot in cylinders, to hold tight piston touches the special adaptation. To straight arrows in pistons towards system of distribution of gas. |
15. To establish sticks they are joined and sticks coverings, holding tight pins the corresponding moment. To check a play of axial side of sticks in necks conrod. |
16. To establish an end of power of the bomb of oil and to screw the bomb of oil together with oil pipelines of oil producing resources. |
Prevention
In case of the installation of the new bomb it is necessary to fill it of the oil and to turn several times a hand his power end.
|
|
17. To establish the new placing (when what was polished with the briefcase pressuriza) in hall flutes (the drawing in the left) and behind (the drawing on the right) the coverings of the radical loads of an end of inclination, to insert the new placing of the trundle bed of oil and to hold tight them in flutes. |
|
18. To install the trundle bed of oil and his pins insist on three stages, from a pin (A), on the direction of a pin (V), and soon of a pin (V) to a pin (E). |
19. To establish an empurrador of the walk of the bomb of fuel and the fuel they pump with the placing. |
20. To establish a colonist of oil (to register it glue of Loctite). |
21. To install the bomb of cooling the liquid. |
22. To establish a filter of oil together with the placing. The case of a filter of oil one must shake hands to a contact, and soon in 3/4 turns. |
23. To crush the sensor of pressure of oil. |
24. To establish a pulley in an end of inclination (the party strengthened in the direction of a pendulum). |
25. To twist in in the cylinder block at the pins place n ° 7 and 9 (to see the rice. The order of the pressure of pins of the fixation of a head of the cylinder block), the pins that align a head of the cylinder block (3.1.2.2.4 sees the subsection). To establish the placing of a head of the cylinder block for the directed inscription. |
26. To install in the 1st cylinder the piston in the superior dead point (TDP) and a pulley of axle so that it receives the combination of adjusting signs (to see the rice. To adjust signs of system of distribution of gas). |
27. To establish a head of the cylinder block, to insert (except pins n ° 7 and 9) and to hold tight lightly front pins, to take the very fast pins of alignment and at his place of supporting in two remained pins. To hold tight respectively pins of the fixation of a head of the cylinder block. |
28. To establish in an inclination end a pulley (the concave party on the outside), a belt of gear and his covering. |
29. To install elastic oil pipelines of the system of cooling and to adjust a tension of a belt of gear. |
Prevention
Of this point it must make spin the end of inclination only in the direction of his rotation in the operational time of the motor.
|
30. To adjust the position of the creator, to install the bomb of cooling the liquid and the supporter. |
31. To establish a pulley of the creator and there pulls the side a belt so that his deflexão did 10 mm. |
32. To check if the piston of the 1st cylinder in the provision of VMT is installed and to install the distributor of ignition. |
33. The vacuum oil pipeline adheres to the system of the ignition. |
34. To check and in case of the necessity of adjusting a slit of valves. |
35. To establish a covering of a head of the cylinder block, paying attention to the correct agreement of his placing. |
36. There insist pins of the fixation of a covering of a head of the cylinder block on the corresponding sequence (to see the rice. Order of pressure of pins of a covering of a head of the cylinder block). |
37. To crush in a head of the cylinder block of a capture of spark and to join wires of the high voltage. |
38. To insert the new placing and to crush a cork of drain in the oil trundle bed. |
39. To join the elastic oil pipeline of the ventilation of a case of the motor. |
40. To insert the rate of the level of oil in an opening of his guide in the cylinder block of the motor. |