FORD'S SCORPIO

1985-1994 of launch

Repair and operation of the car



Ford Skorpio
+1.1. Identification of the car
+2. Maintenance
+3. Motors
+ 4. System cooling
- 5. Fuel system
   5.1. Technical characteristic
   5.2. Fuel
   5.3. Gasoline without lead of V6, 2,4 motors and 2,9 dm3
   +5.4. System of air provision
   -5.5. Carburator of PIERBURG
      5.5.1. Turns agreement of wasting time and quality of mixture
      5.5.2. Agreement of a damper of a valve of butterfly of the first camera
      5.5.3. Agreement of an initial slit of the air door
      5.5.4. Removal and installation of the carburator
      5.5.5. Desmontagem of the carburator
      5.5.6. Meeting of the carburator
      5.5.7. Adjust of bystry to waste time
      5.5.8. Modifications of Pierburg 2V carburator from September of 1986
   +5.6. WEBER 2V carburator
   +5.7. WEBER 2V carburator of TLD
   +5.8. System of injection of fuel
   5.9. Removal and installation of a collector of entry
+6. Union
+7. Transmissions
+8. Driving axle and rear bridge
+9. Direction
+10. Supports of the triangular form of interruption
+11. Brakes system
+12. Wheels and tires
+13. Body
+14. Electric equipment


bfe6b27a


5.5.3. Agreement of an initial slit of the air door

GENERAL INFORMATION

Agreement of the initial agreement of the air door

The initial agreement is shown by an arrow.

ORDER OF REALIZATION
1. To withdraw the case of the filter of air.
2. To unscrew the central pin of the fixation of the camera to cool the liquid and to withdraw the camera. Below a head of a pin and in the perimeter the cameras mount consolidations you cancel.
3. In case of one spring bimetálica and the bearer of the lever of the door there there are etiquettes. They have the absence of etiquettes of putting itself. To unscrew three screws maintaining a clip to cancel and to withdraw a clip and the case.
4. The completely nearby one the air door so that there will turn against the stop in the direction of the movement of the pointers of the clock the lever of the walk of the air door and will protect it in this provision for an elastic band.
5. To move the lever of the walk of the air door to the knot of a diaphragm of vacuum of the initial agreement. In spite of the fact that this finality installs the screw of the agreement of wasting time in the superior step of a came.
6. To measure through a furadeira or one to measure they seed a slit between an edge of the air door and a wall of the carburator. The slit will be the same as 3 mm.
7. If necessary, to execute the agreement, using the 2 mm hexagon for key.