FORD'S SCORPIO

1985-1994 of launch

Repair and operation of the car



Ford Skorpio
+1.1. Identification of the car
+2. Maintenance
+3. Motors
+4. System cooling
+5. Fuel system
+6. Union
+7. Transmissions
+8. Driving axle and rear bridge
+9. Direction
+ 10. Supports of the triangular form of interruption
- 11. Brakes system
   11.1. Technical characteristic
   +11.2. Dispatch brakes
   +11.3. Subsequent brakes
   11.4. Agreement of the brake of emergence
   11.5. Removal of air of the system of brakes
   -11.6. System antiblockade
      11.6.1. Check that works
      11.6.2. Removal and installation of hydraulic knot of management
      11.6.3. Removal and installation of a pedal of brake
      11.6.4. Removal and installation of the accumulator of hydraulic knot
      11.6.5. Removal and installation of the bomb and motor of hydraulic knot
      11.6.6. Substitution of the sensor of speed of rotation of an advanced wheel
      11.6.7. Substitution of the sensor of speed of rotation of a rear wheel
+12. Wheels and tires
+13. Body
+14. Electric equipment


bfe6b27a


11.6.2. Removal and installation of hydraulic knot of management

GENERAL INFORMATION

Hydraulic knot


The place of fixation of the basic tire in hydraulic knot

Removal

ORDER OF REALIZATION
1. To put the ignition out.
2. To lower the pressure in the hydraulic system.
3. To withdraw a covering of leaf of the hydraulic knot of the management.
4. Desconectar been overcome with electric wires of the hydraulic knot of the management (1 – taken of the valves knot eletromagnéticas, 2 – taken of the valve eletromagnética main, 3 – taken of the sensor of fires of the frenagem, 4 – the capture of the hydraulic bomb).
5. To withdraw through the syringe they curb the fluid of a tank.
6. Desconectar hydraulic oil pipelines of the knot of the management.
7. To close the corresponding hats of an opening in oil pipelines and a case of the hydraulic knot of the management.
8. To withdraw a covering of the floor below a brake pedal.
9. There unscrew pins (they are specified by firearms) the fastenings of the hydraulic knot of the management.
10. To withdraw the hydraulic knot.

Prevention

After the removal of the hydraulic knot of the management not to touch a nucleus of empurrador.


Installation

ORDER OF REALIZATION
1. For the installation of the hydraulic knot of the management it is necessary to execute operations in the return sequence regarding the process of his removal.
2. After the installation of the hydraulic knot of the management it is necessary to withdraw the air of the system of brakes (11.5 to see the subsection).