FORD'S SCORPIO

1985-1994 of launch

Repair and operation of the car



Ford Skorpio
+1.1. Identification of the car
+2. Maintenance
+3. Motors
+4. System cooling
+5. Fuel system
+6. Union
+ 7. Transmissions
- 8. Driving axle and rear bridge
   8.1. Technical characteristic
   +8.2. Driving axle
   -8.3. Zadny Bridge
      8.3.1. Removal and installation of the rear bridge
      8.3.2. To be demolished and meeting of the rear bridge
      8.3.3. Differential Desmontagem
      8.3.4. Differential meeting
      8.3.5. Agreement of loads of wheels of gear of the main transfer
      8.3.6. Agreement of wheels of gear of the main transfer
      8.3.7. Meeting and agreement of the main transfer
      8.3.8. Substitution of a ring of fighter of a wheel of gear of the main transfer
   +8.4. Power ends
+9. Direction
+10. Supports of the triangular form of interruption
+11. Brakes system
+12. Wheels and tires
+13. Body
+14. Electric equipment


bfe6b27a


8.3.6. Agreement of wheels of gear of the main transfer

GENERAL INFORMATION

Measurement of an axial slit between semiaxial wheels of gear and a box of differential


Measurement of the moment of resistance of rotation of a wheel of gear of the main transfer through a dynamometer 15.041 and when 15.073 were taken


ORDER OF REALIZATION
1. To establish flanges (to see the rice. The details of the rear bridge) of the agreement of a slit of loads of a box of the differential one without putting of the round section.
2. To install the differential loads of box oiled, and also the differential box that it substitutes.
3. To crush a few flanges of the hands of the agreement of a slit of loads of a box of the differential one before contact with them with loads and to hold tight a nut done edges of the fixation of the box of substitution.
4. To turn the box that it substitutes repeatedly of the right placing of rolls of loads.
5. To install indicative of hour they type in a case, and to rest his tip of measuring against the way of the box of substitution.
6. To carry out a whole revolution of the box of substitution and to look at fluctuations of an arrow of the indicator.
7. To install the substitution they pack up the situation in which the arrow of the indicator costs a middle situation between extreme indications. Not to make spinning the box of substitution any more.
8. To install indicative of hour they type in the bearer (adaptation 15.008). To rest his tip of measuring against a standard of the adaptation 15.075 and adjusting the indicator. For the bridge 7,5 inches to use the lowest airplane of a standard, and for the bridge 7 inches – the best airplane.
9. To rest the bearer of the indicator against a face of end of a wheel of gear of the main transfer and a tip of measuring of the indicator – against the way of the box of substitution.
10. To withdraw a difference about the distance established according to a standard.
11. To correct the measured distance, selecting the placing of thickness between the internal load of the wheel of main gear and a wheel of gear of the main transfer for which the detour of the null indication of the indicator done not more than 0,01 mm.
12. After corseting itself of a nut of the fixation of loads of wheels of gear it must be fullered.
13. Through the adaptation 15.047 one to establish a new ring of fighter of a wheel of gear of the main transfer.
14. To establish a flange of a wheel of gear of the main transfer (for the connection with the rear hinge of the driving axle) and to hold tight a nut of the fixation of a flange the corresponding moment.