Ford Skorpio +1.1. Identification of the car +2. Maintenance +3. Motors +4. System cooling +5. Fuel system +6. Union +7. Transmissions + 8. Driving axle and rear bridge - 9. Direction 9.1. Technical characteristic +9.2. Service and repair -9.3. Direction with the hydraulic auxiliary rocket 9.3.1. Technical characteristic -9.3.2. Service and repair 9.3.2.1. Removal and installation of directing the transfer 9.3.2.2. To be demolished and meeting of directing the transfer of the GEAR OF CAME 9.3.2.3. To be demolished and meeting of directing the transfer of ZF 9.3.2.4. Removal and installation of a column of direction 9.3.2.5. To be demolished and meeting of a column of direction 9.3.2.6. Removal and installation of the bomb of the amplifier of direction 9.3.2.7. To be demolished and meeting of the bomb of the hydraulic auxiliary rocket 9.3.2.8. Substitution and agreement of a tension of a belt of driving 9.3.2.9. Substitution of protective coverings of the mechanism of direction 9.3.2.10. Removal of air of system of direction with the hydraulic auxiliary rocket +10. Supports of the triangular form of interruption +11. Brakes system +12. Wheels and tires +13. Body +14. Electric equipment
|
Bomb of the hydraulic auxiliary rocket of system of direction
1 - power end, 2 - ring fighter, 3 - I marry, 4 - fighter of rings of round section, 5 - flange, 6 - you drive, 7 - ring, 8 - rotor,
|
9, 13 – a lock ring, 10 - I pinch of flange, 11 - spring pressure, 12 - flange, 14 - spring, 15 - valve, 15 - tank, 16 - hair hair clip, 17 - union |
THE BOMB OF THE HYDRAULIC AUXILIARY ROCKET LIKE "Р"
ORDER OF REALIZATION |
1. To compensate for the bomb on the outside. |
2. To fix the bomb in a vice with gentle sponges of the case, an end of being able down. |
3. To withdraw a hair clip of hair, the union and a hunting touch of the rear party of the bomb. |
4. To withdraw a tank and the rings of fighter of the round section of the case. |
|
5. To insert a nucleus in the opening in an accommodation of bomb located in front of the valve of the control of a current, to hold tight a ring of lock of the fixation of a flange, and, using the screwdriver, to withdraw a ring of lock. |
|
6. To withdraw a flange (1), a spring of pressure (2) and a ring of fighter. |
7. To withdraw the bomb of a vice, to turn it and to withdraw the valve of a current and one spring. |
8. To withdraw a ring of lock of an end and to take an end. |
9. To withdraw a ring of the bomb, blade, a rotor and a flange. |
10. To withdraw two guides and a ring of fighter of an end of power. |
|
11. To withdraw and to compensate for a magneto (it is specified by an arrow), previously having observed his situation. |
12. To wash itself out and to compensate for all the details of the bomb. |
13. The installation is done in the sequence, the return to the removal, at the same time it is necessary to execute the next operations. |
14. To establish a ring of fighter of an end of only new power. |
|
15. To establish a ring of fighter of a flange of pressure in the third flute (it is specified by an arrow) of the rear party of the case. |
16. To check that the guides entered in openings of a flange of pressure. |
|
17. The firearms in a ring of the bomb have to address. |
18. To establish a ring of fighter of a flange in the second flute in the case. Before the installation of sealing rings they have to be lubricated. |
|
BOMB OF THE AUXILIARY ROCKET HYDRAULIC "ASS"
The bomb of the hydraulic auxiliary rocket of system of direction as ASS
1 - tank, 2 - lock the ring, 3 - flange, 4, 9, 12, 19 – a fighter ring, 5 - rotor, 6 - you drive, 7 - ring, 8 - I pinch of flange, 10 - spring, 11 - the direction finger,
|
13 - taken, 14 - flange, 15 - power end, 16 - lock the ring, 17 - flange, 18 - supports of the triangular form of fixation of a tank, 20 - spring, 21 - valve, 22 - union |
ORDER OF REALIZATION |
1. To compensate for the bomb on the outside. |
2. To withdraw two clips of the fixation of a tank and a tank of an accommodation of bomb. |
3. To withdraw the union, the valve and one spring. |
4. To withdraw a flange of an end of power of the bomb. |
5. To withdraw a ring of lock of the load, to take an end of power and the load of the bomb. To withdraw a ring of fighter of an end of power of an accommodation of bomb. |
6. To withdraw a ring of lock of a flange so that the corresponding nucleus will hold tight it. A nucleus to hold tight the center of a flange with a diameter of 13 mm of an end of power and to hold tight out a flange. To withdraw a ring of fighter of a flange. |
7. To take the capture of the bomb. |
8. To wash itself out and to compensate for all the details of the bomb. |
9. The installation is done in the sequence, the return to the removal, at the same time it is necessary to execute the next operations. |
10. To check that the guides entered in openings of a flange of pressure. |
11. The face of end of a rotor has to send the Shlitseva to itself. |
12. To do the installation of a flange of an end of power, which twists in in an end a pin with a lavador that napressut a flange in an end. |
13. Before the installation of sealing rings they have to be lubricated. To establish only new rings of fighter. |
|
|
|