Ford Skorpio +1.1. Identification of the car +2. Maintenance + 3. Motors - 4. System cooling 4.1. Technical characteristic +4.2. Unloading of liquid and stuffing of the system of cooling 4.3. Removal and installation of an electric heater 4.4. Removal and installation of the thermostat +4.5. Supporter 4.6. Cooling of bomb of system 4.7. Temperature sensor 4.8. Driving of belt of the motor DOHC 4.9. Mechanism of a tension of a belt of driving +5. Fuel system +6. Union +7. Transmissions +8. Driving axle and rear bridge +9. Direction +10. Supports of the triangular form of interruption +11. Brakes system +12. Wheels and tires +13. Body +14. Electric equipment
|
MOTORS OF OHC
Removal
ORDER OF REALIZATION |
1. Desconectar a wire of the weight of the accumulator and to fuse the liquid of the system of cooling. |
2. To remove the supporter together with the union. |
3. A belt takes away the side. |
|
4. To unscrew pins and to withdraw a pulley of the bomb of cooling the liquid. |
5. Desconectar to elastic oil pipeline driving to a heater of the bomb of cooling the liquid. |
6. To withdraw the elastic oil pipeline of cooling the liquid between the bomb of cooling the liquid and an electric heater. |
7. To unscrew three pins of the fixation and to discover a belt of gear. |
8. To unscrew three pins of the fixation of the bomb of cooling the liquid and taking completely the bomb. |
|
Repair
ORDER OF REALIZATION |
1. To take of a bomb accommodation they pump the knot of end with the consolidation, the load of precision and a rotor. |
2. To withdraw a selante of an end of the bomb and to take the load of precision of an accommodation of bomb. |
3. Through a ring and an end of the corresponding diameter and length to move a nave of pulley of bomb for an end of bomb so that the end of an end influenced 1,5 mm on an extern surface of a nave. |
4. To install a new selante in an end of the bomb and in the deepening in the case. |
5. To establish in a bomb end his rotor so that the slit between his blades and a bomb accommodation did 0,8 mm. |
|
Installation
ORDER OF REALIZATION |
1. To compensate for the surfaces to connection of an accommodation of bomb and the cylinder block of the motor. |
2. To install the bomb together with the new placing in the cylinder block. |
3. To establish a covering of a belt of gear. |
4. To join the elastic oil pipelines that join the bomb to an electric heater and the heater to the bomb of cooling the liquid. |
5. To install the supporter. |
6. To adjust a tension of a belt of side. |
7. To fill the system of cooling, to join the accumulator and to check the tension and the functioning of the system of cooling. In case of the necessity of adding the level of cooling the liquid. |
|
MOTORS OF DOHC
Motor of DOHC system elements cool
|
1 - bomb pulley,
2 - water bomb,
3 - fighter of ring of the bomb,
4 - a tube of branch of hose of a heater,
5 - a tube of branch of hose to a heater |
Removal
ORDER OF REALIZATION |
1. To withdraw a weight they connect of the accumulator. |
2. For the improvement of the access to the bomb in motors with the system of the injection of the fuel to withdraw an air entry, the camera of the elevated pressure and the filter of air. |
3. To fuse the liquid that cools of the cooling system. |
4. To take away a belt of driving. |
5. To unscrew 4 pins of the fixation of a pulley of the water bomb and to withdraw a pulley. |
|
6. To substitute the corresponding container below the bomb, to unscrew 5 pins of the fixation of the bomb and to take the bomb. |
|
7. To withdraw a ring of fighter of the bomb (it is specified by an arrow). The ring of fighter of the water bomb of the round section is subject to the substitution. |
|
Installation
The installation is done in the sequence, the return to the removal.
Hoses connection to the case of the water bomb of the motor DOHC
|
E - a heater hose – up to May of 1990,
B - a hose of a wide tank – up to May of 1990,
C - electric heater hose |
In models until the hoses of May of 1990 of cooling the liquid were joined to a covering of the water bomb when as the drawing was shown.
In models from May of 1990 the hose of a heater (A) and a hose of a wide tank (V) are substituted with places.
If the hoses were withdrawn in more advanced models, they will be will be joined repeatedly as in subsequent models, which a heater hose must join to the union B and a hose of a wide tank with the union A. It will reduce the noise of a heater because of the air in the system. MOTORS OF V6
ORDER OF REALIZATION |
1. Desconectar a wire of the weight of the accumulator and to fuse the liquid of the system of cooling. |
2. To remove the supporter together with the union. |
3. A belt takes away the side. |
4. To unscrew pins and to withdraw a pulley of the bomb of cooling the liquid. |
5. Desconectar to hose lower of an electric heater and a hose of a heater of the case of thermostat. |
6. To unscrew three pins of the fixation of the case of the thermostat to the water bomb. |
7. To withdraw the case and the thermostat. |
|
8. To unscrew twelve pins and to withdraw the water bomb. In some models it is necessary to withdraw a pulley of an end of inclination and a quencher of fluctuations tortional from the access to the lowest pins of the fixation of the bomb. |
|
|
|